36 practice questions with answers for ISTQB interviews in Hyderabad.

ISTQB jobs in Hyderabad

Hyderabad has large engineering and capability centres of global technology, banking and pharma companies around HITEC City and the Financial District. Many roles are with global capability centres that work with teams in the US and Europe.

Below are 36 questions that match the mix of service, product and domain employers hiring manual test engineers in Hyderabad.

Solved for HyderabadStart practicing
3 QUESTIONS FREESign up to unlock the full question bank and track your progress.Unlock every question and answer, then continue practising company-wise and package-wise.
3 questions free Unlock the rest in seconds
01

What formats can acceptance criteria take?

Save to ▾
Show answer
The two common formats are scenario-oriented, such as the Given/When/Then style used in BDD, and rule-oriented, such as a bullet-point verification list or a tabulated input-output mapping. Acceptance criteria define the scope of the story, reach consensus among stakeholders, describe positive and negative scenarios, serve as the basis for acceptance testing and support accurate planning and estimation. Teams can also use other formats as long as criteria are well defined and clear.
02

What is the value of static testing?

Save to ▾
Show answer
Static testing detects defects in the earliest phases, when they are cheapest to fix. It finds defects that dynamic testing cannot, such as unreachable code or defects in non-executable work products. It helps evaluate quality and build confidence, improves shared understanding among stakeholders, and gives fast feedback on code through static analysis in CI. Reviews cost effort, but the total cost of quality is usually lower.
03

What are the benefits and risks of DevOps for testing?

Save to ▾
Show answer
DevOps joins development and operations through a CI/CD pipeline. Benefits for testing: fast feedback on code quality, shift-left through automated component tests and static analysis on every commit, stable environments through automation, more visibility of non-functional qualities and less repetitive manual work. Risks: the pipeline must be defined and maintained, CI/CD tools must be set up, and automation needs extra resources. Manual testing from the user's perspective is still needed.
04

How are CTFL v4.0 exam questions distributed across chapters?

Save to ▾
Show answer
Approximately: Chapter 1, Fundamentals of Testing, 8 questions; Chapter 2, Testing Throughout the SDLC, 6; Chapter 3, Static Testing, 4; Chapter 4, Test Analysis and Design, 11; Chapter 5, Managing the Test Activities, 9; Chapter 6, Test Tools, 2. Chapters 4 and 5 carry half the marks and include most K3 questions, so practise techniques and estimation thoroughly.
05

What are false positives and false negatives in testing?

Save to ▾
Show answer
A false positive is a test result that reports a defect when none exists, for example a test failing because of wrong test data or an unstable environment. A false negative is a test that passes even though a defect is present, so the defect is missed. False positives waste time and reduce trust in tests; false negatives are more dangerous because defects escape to production.
06

Tell me about an exploratory testing session that found a critical defect.

Save to ▾
Show answer
Situation: a ticket booking app had passed all scripted tests. Task: run a one-hour exploratory session on seat selection. Action: I tried quick double taps, switching networks and booking the same seat from two devices. Result: two users could book the same seat. I logged a detailed report with videos, it was fixed before release, and concurrency tests were added to the regression suite.
07

Write a test charter for an exploratory session on a checkout page.

Save to ▾
Show answer
Charter: Explore the checkout page with different coupon and payment combinations to discover pricing and rounding errors. Time box: 60 minutes. Focus areas: coupon stacking, expired coupons, quantity changes after applying a coupon, currency rounding, and using the browser back button. Record test ideas, defects, questions and areas covered. Debrief with the test lead after the session to agree next charters.
08

How does configuration management support testing?

Save to ▾
Show answer
Configuration management identifies, controls and tracks work products such as test plans, test cases, scripts, test results, test data, environments and the test object itself. It ensures all configuration items are uniquely identified, version controlled, tracked for changes and related to each other so traceability is kept. Baselines can only be changed through formal change control. This lets testers know exactly which build and testware versions were tested.
09

You join a Scrum team with two-week sprints. What testing activities would you do during a sprint?

Save to ▾
Show answer
I would join backlog refinement to review stories and acceptance criteria, help estimate test effort in sprint planning, write acceptance tests early, pair with developers on automation, test each story as soon as it is ready, keep regression running in the CI pipeline, run exploratory sessions on new features and share testing feedback in the retrospective. Testing runs continuously rather than at the end of the sprint.
10

A developer misreads a tax rule, codes the wrong formula, and a customer later sees an incorrect invoice total. Identify the error, defect and failure.

Save to ▾
Show answer
The error is the human mistake: the developer misreading the tax rule. The defect is the wrong formula in the code. The failure is the incorrect invoice total seen when the code runs. The root cause might be an ambiguous requirement or time pressure. Remember for the exam that not every defect causes a failure; it does so only when the defective code executes under certain conditions.
11

A field accepts integers from 5 to 15. List the 3-value BVA test values.

Save to ▾
Show answer
In 3-value BVA, each boundary gives the boundary value plus both neighbours. Lower boundary 5 gives 4, 5 and 6. Upper boundary 15 gives 14, 15 and 16. So the six values are 4, 5, 6, 14, 15 and 16. Compared with 2-value BVA (4, 5, 15, 16), the extra values 6 and 14 help detect mistakes in comparison operators inside the range.
12

What is testware? Give examples from different test activities.

Save to ▾
Show answer
Testware is any work product created during the test process. Examples: test plan and risk register from planning; progress reports and control directives from monitoring and control; prioritised test conditions from analysis; test cases, test charters and coverage items from design; test procedures, automated scripts, test suites and test data from implementation; test logs and defect reports from execution; and the test completion report with lessons learned from completion.
13

Payment type has 3 partitions (card, UPI, wallet) and customer type has 2 (new, existing). What is the minimum number of tests for Each Choice coverage?

Save to ▾
Show answer
Each Choice coverage needs every partition from each input used at least once, and one test can cover one partition of each input at the same time. So the minimum equals the largest number of partitions: 3. Example tests: card with new, UPI with existing, wallet with new. Covering all combinations would need 3 x 2 = 6 tests, which is not required for Each Choice.
14

A developer says one value per partition is enough. Why might you still add boundary tests?

Save to ▾
Show answer
Equivalence partitioning assumes all values in a partition behave the same, but many defects occur at the edges, where developers write '>' instead of '>=' or use the wrong limit. One middle value like 35 in an 18 to 60 range will never reveal these. Boundary value analysis adds tests at 17, 18, 60 and 61, so the two techniques together give good coverage with few tests.
15

Write a BDD scenario for locking an account after three failed login attempts.

Save to ▾
Show answer
Feature: Account lockout Scenario: Lock account after three failed attempts Given a registered user with an active account When the user enters a wrong password 3 times in a row Then the account is locked And the message 'Account locked. Try again after 30 minutes' is shown Given sets the context, When is the action and Then is the expected outcome.
16

What is the whole team approach?

Save to ▾
Show answer
In the whole team approach, any team member with the right knowledge can perform any task, and everyone is responsible for quality. The team shares a physical or virtual workspace, and testers work closely with business representatives to create acceptance tests and with developers to agree the test strategy and automation. It improves communication and uses combined skills, although safety-critical contexts may still need higher test independence.
17

What is the difference between the test management role and the testing role in CTFL v4.0?

Save to ▾
Show answer
v4.0 describes roles, not job titles. The test management role owns the test process, the test team and leadership of test activities, mainly planning, monitoring and control, and completion. The testing role owns the engineering side: test analysis, design, implementation and execution. One person can hold both roles, and in Agile teams some management tasks are done by the team while cross-team coordination may sit with a test manager.
18

A manager says, 'Testing found zero defects in this release, so the software is defect-free.' How do you respond?

Save to ▾
Show answer
Testing shows the presence of defects, not their absence, so finding none only reduces the probability of undiscovered defects. I would also raise the absence-of-defects fallacy: did our tests cover real user needs? I would share coverage data, untested risk areas and whether our tests may have worn out. A more accurate statement is 'no defects were found within the agreed coverage and risk scope'.
19

Testing found 80 defects and users found 20 more after release. What is the defect detection percentage?

Save to ▾
Show answer
DDP = defects found in testing / (defects found in testing + defects found after release) x 100 = 80 / (80 + 20) x 100 = 80 / 100 x 100 = 80 percent So testing caught 80 percent of known defects. Tracking DDP across releases shows whether test effectiveness is improving.
20

Free shipping applies for orders of 499 rupees or more, otherwise a fee of 40 applies. Design tests using EP and BVA.

Save to ▾
Show answer
Partitions: 0 or less is invalid, 1 to 498 pays 40, and 499 or more ships free. EP tests: 0 rejected, 250 pays 40, 800 free. 2-value BVA adds 0 and 1 at the lower edge and 498 and 499 at the free shipping boundary. Combined minimal set: 0, 1, 250, 498, 499 and 800, each with the expected fee clearly stated.
21

Your tests achieved 100 percent branch coverage, yet users reported a defect. How is that possible?

Save to ▾
Show answer
Coverage shows which code was executed, not that the code is correct or complete. The defect may come from a missing requirement that was never coded, which white-box testing cannot detect; from specific data values not used in tests; from integration or environment issues; or from wrong expected results. Coverage is a useful measure of thoroughness, but it must be combined with black-box and experience-based techniques.
22

Give an example of a high-severity low-priority defect and a low-severity high-priority defect.

Save to ▾
Show answer
High severity, low priority: the app crashes when exporting a report in a legacy format that almost nobody uses; the impact is severe but rarely triggered, so it can wait. Low severity, high priority: the company logo is misspelled on the home page before a major launch; functionality is unaffected, but brand impact makes it urgent. Severity reflects impact, priority reflects business urgency.
23

What is risk, and how do project risks differ from product risks?

Save to ▾
Show answer
A risk is a potential event or condition whose occurrence causes an adverse effect. Risk level is determined by likelihood and impact. Project risks affect the management and control of the project, such as staff shortages, delays, budget cuts, vendor problems or tool issues. Product risks relate to quality characteristics of the product, such as missing functionality, wrong calculations, slow response, poor security or bad usability.
24

How do you perform a simple root cause analysis on a production failure?

Save to ▾
Show answer
Collect the failure details and logs, reproduce the issue and identify the defect. Then ask 'why' repeatedly until you reach a process cause. Example: a wrong discount was shown; why? the code used an old rule; why? the requirement changed without notice; why? there was no change review step. Action: add change notifications and a review step. Fixing root causes prevents whole families of similar defects.
25

How do you report test status to non-technical stakeholders?

Save to ▾
Show answer
I focus on decisions they need to make. I use a short dashboard: overall status in plain words, coverage of key requirements, open critical defects and their business impact, top risks with mitigation, and what is needed from them. I avoid jargon, use simple charts and trends, and keep detailed data available for anyone who wants it. Different audiences may need different levels of detail.
26

Which work products can be examined by static testing?

Save to ▾
Show answer
Almost any work product that can be read and understood: requirements, user stories, acceptance criteria, architecture and design documents, source code, test plans, test cases, test charters, backlog items, contracts, project plans, schedules and budgets. Static analysis tools need work products with a formal structure, such as code or models with defined syntax. Products that are hard for humans to interpret, like third-party executable code, are not suitable for review.
27

Why is traceability between the test basis and testware important?

Save to ▾
Show answer
Traceability links test basis items such as requirements, risks and user stories to test conditions, test cases, results and defects. It lets teams measure coverage, assess the impact of changes, support audits in regulated domains and report progress in business terms, for example 'requirement R12 has three passed tests and one open defect'. When a requirement changes, traceability shows exactly which tests must be updated or re-run.
28

What changed in CTFL v4.0 compared with the 2018 syllabus?

Save to ▾
Show answer
v4.0 added Agile and DevOps content: the whole team approach, test-first approaches like TDD, ATDD and BDD, shift-left, retrospectives, collaboration-based test approaches, the test pyramid and testing quadrants. It renamed the pesticide paradox to 'tests wear out', removed use case testing and decision coverage, focused white-box testing on statement and branch coverage, and described test roles instead of job titles.
29

Which black-box test techniques are covered in CTFL v4.0?

Save to ▾
Show answer
CTFL v4.0 covers four black-box techniques: equivalence partitioning, boundary value analysis (2-value and 3-value), decision table testing and state transition testing. They derive tests from the specification without looking at the internal structure, so tests stay valid even when the implementation changes. Use case testing, which was in older syllabi, is no longer part of the v4.0 Foundation syllabus.
30

What is the difference between confirmation testing and regression testing?

Save to ▾
Show answer
Confirmation testing checks that an original defect has been fixed, by re-running the failed tests or new tests that cover the change. Regression testing checks that a change, including a fix, has not caused adverse effects elsewhere, in the same component, connected components or the environment. Regression suites grow and run often, so they are strong candidates for automation, typically inside a CI pipeline.
31

In a review, what is the difference between an anomaly and a defect?

Save to ▾
Show answer
Reviewers log anomalies: observations that differ from what they expected. Not every anomaly is a defect; some turn out to be misunderstandings, open questions or improvement suggestions. During communication and analysis the team decides each anomaly's status, owner and required action, and confirmed ones become defects for the author to fix. This keeps reviews constructive instead of treating every comment as the author's mistake.
32

In the CTFL exam you have ten questions left and only five minutes. What should you do?

Save to ▾
Show answer
There is no negative marking, so never leave a question blank. Quickly answer the easier ones first, eliminate obviously wrong options on the rest and pick the best remaining choice. Flag nothing new for review now. To avoid this situation, aim to spend about one minute per question in the first pass and skip long calculation questions to revisit later.
33

A production hotfix must go live in three hours. How do you decide what to test?

Save to ▾
Show answer
I would do a quick impact analysis to see what the change touches, run confirmation tests for the defect, then a risk-based regression subset covering the changed module, its integrations and critical business flows like login and payment. I would use the automated smoke suite in the pipeline, record what was not covered, and plan fuller regression in the next regular release.
34

Your team must choose a new test automation tool. What factors do you consider?

Save to ▾
Show answer
Fit with the technology stack and application types; team skills and learning curve; integration with CI/CD, test management and defect tools; reporting; licensing and total cost of ownership; vendor support or community health for open-source tools; scalability; and compliance needs. I would run a proof of concept on real scenarios, then a pilot on one project before rolling it out widely.
35

Your defect tracker is full of duplicate defects from several testers. How do you fix this?

Save to ▾
Show answer
I would set up a short daily triage to merge duplicates and link them to one master defect. Testers should search existing defects by module and keywords before logging, and use clear titles in a standard format such as 'Module - action - result'. Defined components and labels make searching easier. Tracking duplicate rates also shows whether the guidance is working.
36

Tell me about a time you missed a defect. What did you learn?

Save to ▾
Show answer
Situation: a defect in date formatting reached production after my testing. Task: understand why and prevent it. Action: I owned the miss, found my test data used only one locale, and added test cases for other date formats and locales. I also shared a checklist for locale testing. Result: no similar defect appeared in later releases, and I learned to review my test data as carefully as my test steps.

Companies with offices in Hyderabad (16)

IT services

TCS

ISTQB interview questions

  • 30 questions
  • 4 rounds

Mumbai, Chennai, Pune +2

View questions
IT services

Infosys

ISTQB interview questions

  • 30 questions
  • 4 rounds

Bengaluru, Mysuru, Pune +2

View questions
IT services

Wipro

ISTQB interview questions

  • 30 questions
  • 4 rounds

Bengaluru, Hyderabad, Pune +2

View questions
Consulting

Accenture

ISTQB interview questions

  • 30 questions
  • 4 rounds

Bengaluru, Hyderabad, Pune +2

View questions
IT services

Cognizant

ISTQB interview questions

  • 30 questions
  • 4 rounds

Chennai, Bengaluru, Pune +2

View questions
IT services

Capgemini

ISTQB interview questions

  • 30 questions
  • 4 rounds

Mumbai, Bengaluru, Pune +2

View questions
IT services

HCLTech

ISTQB interview questions

  • 30 questions
  • 4 rounds

Noida, Chennai, Bengaluru +2

View questions
IT services

Tech Mahindra

ISTQB interview questions

  • 30 questions
  • 4 rounds

Pune, Hyderabad, Bengaluru +2

View questions
IT services

LTIMindtree

ISTQB interview questions

  • 30 questions
  • 4 rounds

Mumbai, Pune, Bengaluru +2

View questions
IT services

Coforge

ISTQB interview questions

  • 30 questions
  • 4 rounds

Noida, Greater Noida, Bengaluru +2

View questions
IT services

Virtusa

ISTQB interview questions

  • 30 questions
  • 4 rounds

Hyderabad, Chennai, Bengaluru

View questions
IT services

NTT DATA

ISTQB interview questions

  • 30 questions
  • 4 rounds

Bengaluru, Pune, Noida +2

View questions
IT services

UST

ISTQB interview questions

  • 30 questions
  • 4 rounds

Thiruvananthapuram, Kochi, Bengaluru +2

View questions
IT services

CGI

ISTQB interview questions

  • 30 questions
  • 4 rounds

Bengaluru, Hyderabad, Chennai +1

View questions
IT services

EPAM Systems

ISTQB interview questions

  • 30 questions
  • 4 rounds

Hyderabad, Bengaluru, Pune +2

View questions
IT services

Persistent Systems

ISTQB interview questions

  • 30 questions
  • 4 rounds

Pune, Nagpur, Bengaluru +2

View questions

Frequently asked questions

Which companies hire ISTQB professionals in Hyderabad?

Companies with large offices in Hyderabad include TCS, Infosys, Wipro, Accenture, Cognizant, Capgemini, HCLTech, Tech Mahindra, LTIMindtree, Coforge. Use their company pages below to practise employer-specific sets.

Are ISTQB interviews in Hyderabad different from other cities?

The questions depend more on the company than the city. Hyderabad's mix of employers decides the style: Many roles are with global capability centres that work with teams in the US and Europe

How do I find ISTQB jobs in Hyderabad?

Shortlist companies with Hyderabad offices, keep your CV focused on ISTQB projects, apply on company career pages and job portals with the Hyderabad filter, and practise the questions on this page before each interview.