Sprint planning (estimate test effort), daily stand-up (status and blockers), sprint review (demo) and retrospective (improve). Testers clarify acceptance criteria early and test within the sprint.
Testing services directly without the UI, checking status codes, responses, security and performance. It finds issues early and is faster than UI tests.
SDLC is the full software development life cycle; STLC is the testing life cycle: requirement analysis, test planning, test design, environment setup, execution and closure.
Valid login, wrong password, empty fields, case sensitivity, max length, SQL-injection strings, password masking, 'remember me', lock-out after N attempts and the forgot-password link.
Reproduce and assess impact, inform stakeholders, help developers fix and verify in staging, run regression and check monitoring after the hotfix, then do a post-mortem.
Evaluating software to find defects and confirm it meets requirements. It reduces risk, protects users and saves the cost of fixing bugs after release.
Smoke testing checks that the critical features of a new build work (broad and shallow). Sanity testing checks that a specific fix or area works after a change (narrow and deep).
Internationalisation tests that the product can support many languages and formats; localisation tests that a specific locale is correct for text, currency, date and layout.
28
Release is tomorrow and you can't test everything. What now?
Risk-based testing: cover critical user flows, recent changes and high-defect areas first. Clearly communicate the untested risks and get stakeholder sign-off.
Success, failure and pending flows, timeouts, refunds, double-click payments, every method (UPI, cards, net banking), rounding, security (no card data stored) and reconciliation with bank reports.
30
What is the difference between a story, epic, task and bug in JIRA?
Re-check environment, data, browser and steps; check the logs; try the reporter's setup; add video and console logs; mark it 'cannot reproduce' only after discussing with the developer, and keep monitoring.
Entry criteria are conditions that must be met to start testing (build ready, environment set); exit criteria define when testing can stop (pass rate, no critical defects).
36
What is the difference between static and dynamic testing?
Moves to the chosen floor, doors open and close, door sensor stops closing on obstruction, overload alarm, emergency button, behaviour in a power cut, max capacity and the floor display.
42
How do you handle a bug found late in a release cycle?
Valid keyword, partial match, no results, special characters, very long text, empty search, case sensitivity, spelling errors, suggestions and speed of results.
Talk to developers and users, explore the product, review similar systems, create notes and mind maps, confirm assumptions and write test cases as you learn.
An urgent patch released outside the normal schedule to fix a critical production defect, followed by regression testing and merge back to the main branch.
Status code, response body and schema, headers, response time, error messages for invalid input, authentication (401/403) and that data is saved in the database.
Break the work into modules and test cases, use past velocity or three-point estimation (optimistic, likely, pessimistic), add time for test data, environment issues, retesting and regression, and keep a risk buffer.