#1 India's Top IT Training Institute
×

About Uncodemy

Know more about who we are and what we stand for.

About Us

About Us

Discover our mission to equip individuals with essential IT skills and industry expertise.

Read More →
UnCodeMy Gallery

UnCodeMy Gallery

Explore highlights from our IT training sessions and success stories.

Read More →
Mentors

Mentors

Meet the industry experts who train and guide you through your course.

Read More →
Free Resources

Free Resources

Free tutorials, interview questions, tools and calculators to help you learn.

Explore →
×

Free Resources

Learn, practice and plan your career — bilkul free.

Tutorials

Tutorials

Step-by-step written tutorials to learn any technology at your own pace.

Read More →
Free Counselling

Free Counselling

Book a free video counselling session and pick the right course for you.

Read More →
Online Compiler

Online Compiler

Write, run and test your code online — no setup required.

Read More →
⚡ FREE · IRC STEPS

Superelevation Calculator: IRC Method with Widening and Transition

Design superelevation, extra widening and transition length for a horizontal curve.

  • 🛣️ e by the IRC 4-step method
  • ↔️ Extra widening
  • 📏 Transition length and shift

How to use the Superelevation and Curve Design Calculator

  1. 1. Enter speed and radiusDesign speed and curve radius. Code values are editable inputs.
  2. 2. Set the roadPavement width, lanes, wheelbase and rotation about centre or inner edge.
  3. 3. Get the designSuperelevation, friction check, widening, raise of outer edge and transition.

IRC method for superelevation

Step 1: e = V²/(225R) (75% of design speed, no friction). Step 2: if e ≤ emax, provide it; otherwise provide emax. Step 3: check friction at full speed, f = V²/(127R) − e ≤ 0.15. Step 4: if f is more than 0.15, restrict speed to Va = √(127R(e + f)) or increase the radius.

Commonly used IRC values are emax = 0.07 for plain and rolling terrain and 0.10 for hill roads not bound by snow, with f = 0.15. Extra widening is nl²/(2R) + V/(9.5√R). Transition length is the largest of 0.0215V³/(CR) with C = 80/(75 + V), the rate of introducing superelevation (1 in 150 in plains), and the empirical 2.7V²/R. Check the current IRC codes before design.

Worked example and exam tips

V = 65 km/h, R = 220 m, width 7.5 m rotated about the centre line, 1 in 150: e = 65²/(225 × 220) = 0.085 > 0.07, so e = 0.07. C = 80/140 = 0.57, Ls = 0.0215 × 65³/(0.57 × 220) = 47.1 m; by superelevation 0.07 × 3.75 × 150 = 39.4 m; empirical 2.7 × 65²/220 = 51.9 m. Adopt Ls ≈ 52 m, shift = 52²/(24 × 220) = 0.51 m.

  • Hill roads use 1 in 60 and the empirical coefficient 1.0. Change both inputs.
  • Superelevation is never less than the camber.
  • Round the transition length up for design.

Frequently asked questions

Why is 225 used instead of 127 in step 1?

Step 1 designs for 75% of the design speed with no friction. (0.75V)²/(127R) ≈ V²/(225R). This keeps e practical for slow mixed traffic.

What if friction needed is more than 0.15?

The curve is not safe at that speed. Either restrict the speed to √(127R(e + f)) or use a larger radius.

What is extra widening?

Extra pavement width on curves: mechanical widening nl²/(2R) for off-tracking of rear wheels, and psychological widening V/(9.5√R) for driver comfort.

Is this calculator free?

Yes. You fill a short form once to see your result, and other Uncodemy tools then open without the form. Everything is calculated in your browser and nothing you type is uploaded.

More free tools

See all free tools