Smoke testing checks that the critical features of a new build work (broad and shallow). Sanity testing checks that a specific fix or area works after a change (narrow and deep).
Functional testing checks what the system does (login, checkout). Non-functional testing checks how well it does it (performance, security, usability, compatibility).
Valid login, wrong password, empty fields, case sensitivity, max length, SQL-injection strings, password masking, 'remember me', lock-out after N attempts and the forgot-password link.
Reproduce and assess impact, inform stakeholders, help developers fix and verify in staging, run regression and check monitoring after the hotfix, then do a post-mortem.
Entry criteria are conditions that must be met to start testing (build ready, environment set); exit criteria define when testing can stop (pass rate, no critical defects).
Sprint planning (estimate test effort), daily stand-up (status and blockers), sprint review (demo) and retrospective (improve). Testers clarify acceptance criteria early and test within the sprint.
21
The developer says "it's not a bug". What do you do?
Risk-based testing: cover critical user flows, recent changes and high-defect areas first. Clearly communicate the untested risks and get stakeholder sign-off.
Verification: are we building the product right? (reviews, walkthroughs — no code run). Validation: are we building the right product? (actual testing against user needs).
A development model where each development phase has a matching testing phase, such as requirements with acceptance tests and design with integration tests.
Valid keyword, partial match, no results, special characters, very long text, empty search, case sensitivity, spelling errors, suggestions and speed of results.
Break the work into modules and test cases, use past velocity or three-point estimation (optimistic, likely, pessimistic), add time for test data, environment issues, retesting and regression, and keep a risk buffer.
Internationalisation tests that the product can support many languages and formats; localisation tests that a specific locale is correct for text, currency, date and layout.
Testing shows presence of defects, exhaustive testing is impossible, test early, defects cluster, the pesticide paradox, testing is context-dependent and absence-of-errors is a fallacy.