Severity is impact on the system; priority is urgency of the fix. A crash in a rare report is high severity, low priority; a spelling mistake in the logo is low severity, high priority.
Break the work into modules and test cases, use past velocity or three-point estimation (optimistic, likely, pessimistic), add time for test data, environment issues, retesting and regression, and keep a risk buffer.
Testing services directly without the UI, checking status codes, responses, security and performance. It finds issues early and is faster than UI tests.
06
What is the difference between DELETE and TRUNCATE?
A development model where each development phase has a matching testing phase, such as requirements with acceptance tests and design with integration tests.
Moves to the chosen floor, doors open and close, door sensor stops closing on obstruction, overload alarm, emergency button, behaviour in a power cut, max capacity and the floor display.
16
How do you reduce the number of defects slipping into production?
Evaluating software to find defects and confirm it meets requirements. It reduces risk, protects users and saves the cost of fixing bugs after release.
Learning, test design and execution at the same time, without scripted cases — time-boxed sessions with a charter (e.g. 'explore checkout with coupons'), noting bugs and ideas. Great for finding edge cases.
Testing shows presence of defects, exhaustive testing is impossible, test early, defects cluster, the pesticide paradox, testing is context-dependent and absence-of-errors is a fallacy.
31
The developer says "it's not a bug". What do you do?
An urgent patch released outside the normal schedule to fix a critical production defect, followed by regression testing and merge back to the main branch.
SDLC is the full software development life cycle; STLC is the testing life cycle: requirement analysis, test planning, test design, environment setup, execution and closure.
42
What is the difference between alpha and beta testing?
Talk to developers and users, explore the product, review similar systems, create notes and mind maps, confirm assumptions and write test cases as you learn.
Sprint planning (estimate test effort), daily stand-up (status and blockers), sprint review (demo) and retrospective (improve). Testers clarify acceptance criteria early and test within the sprint.
Status code, response body and schema, headers, response time, error messages for invalid input, authentication (401/403) and that data is saved in the database.
Re-check environment, data, browser and steps; check the logs; try the reporter's setup; add video and console logs; mark it 'cannot reproduce' only after discussing with the developer, and keep monitoring.